IPUSA Pavilion 1

5724 East North Avenue, Kalamazoo, MI 49048, USA

More Information

IPUSA Pavilion I–II is a 624,000-square-foot industrial warehouse facility developed in two phases to support modern distribution and logistics operations. Phase I, totaling 296,000 square feet, was delivered in 2023, followed by Phase II, comprising 328,000 square feet, completed in 2024.

The facility is designed to accommodate high-throughput industrial users, featuring 32-foot clear heights, 60 dock doors, four overhead doors, and 50 dedicated trailer parking spaces. Construction incorporates Varco Pruden steel framing, 3-inch Kingspan insulated metal panels (IMP), and Purlin Glide 10-inch insulation, supporting durability, energy performance, and long-term operational efficiency.

 

IPUSA Pavilion I–II enabled Allen Distribution, a national third-party logistics provider, to establish its first distribution center in the state of Michigan, reinforcing the project’s role as a mission-critical logistics asset and validating its market positioning.

Contact

Devop Invest Green Logo

Great Lakes Capital


Phone: 574-251-4400

Contact Us

Share this Listing

Who We Are
Targeting Opportunity and Building Value
Martin Huttenlocker Headshot

Martin Huttenlocker

Development Manager

Leveraging 17 years of relationships and extensive background in the commercial real estate industry, Martin provides direct strategic and analytical support as part of the Great Lakes Capital development team. Since joining the firm in 2017 he has performed a hybrid role in asset management and brokerage services within the GLC portfolio. Martin earned a BA in Political Science from the University of Missouri/Columbia and an MBA from Roosevelt University in Chicago.